New Manufacturing Center
Adams Manufacturing*

Maintaining production a major challenge in plant re-organization

When Adams Manufacturing decided to restructure its worldwide manufacturing operations, the Toronto plant was selected as a manufacturing center for the Halls line of cough tablets. To support this initiative, the plant required a major upgrade to increase Halls production and re-organize the other product lines.

In order to keep the plant running, it was necessary to complete the re-organization in a total of five (5) carefully planned stages.

The project included:

  • a system for pre-mixing powder ingredients
  • dust collection
  • two stages of continuous cookers
  • a tablet line with mixing, forming, cooling and packaging operations
  • piping for ingredients and services
  • power distribution
  • demolition and removals
  • new rooms and kitchen with special finishes

Dick Engineering was retained to perform the following services:

  • code compliance and permitting
  • detailed engineering
  • construction management
  • field engineering
Project Statistics
Location Toronto, ON
Capital cost US$35,000,000
Schedule 10 mo
* division of Pfizer Canada Inc.

Click here for a printer-friendly Adobe Acrobat (PDF) version of this profile. Click here, or select the icon on the left to download the free Adobe Acrobat Reader software required to view this file.